Princess Anne Hospital – Electrical Infrastructure Upgrade

Princess Anne Hospital – Electrical Infrastructure Upgrade

Industrial & Commercial

Client

Southampton Universities Hospital Trust

Value

£3.8 million

Contractor

Cuffe PLC

Time Frame

18 months

HV / LV infrastructure upgrade including Standby Generation facilities.

Enabling works comprising fully essential load temporary substation provision c/w standby generation provided as a Sub-contractor design package in advance of main works.

Full HV / LV distribution network upgrade to entire hospital including the load shedding of essential services via automatic control system enhancing system resilience and supply capacity. The existing hospitals services where maintained throughout.

NIC EIC accreditation.
ECA accreditation.
Construction Online accreditation.
CHAS accreditation.

Get In Touch

We’re here to assist with your electrical needs.

Email

info@reaveyelectrical.co.uk

Phone

023 8045 4560

Office Address

Unit 21, Mitchell Point, Ensign Way, Hamble, Southampton, SO31 4RF